Day 1


System Activation Code:
41108
Life Support Systems: Full Capacity. . .100%
Power Unit: Charging
. . .

. . .
Power Unit: Full Capacity. . .100%


Project: PUPPET, Operational for the first time. Date: November 5th, 1992

I am operational.

Optic Sensors: Online at 100% Capacity
Gauging Analysis Levels
. . .

. . .

--Error: Correcting gaze maneuver. Unknown anomaly approximately 3 meters ahead.
. . .

. . .
Optic Sensors now Online at Full Capacity. Anomaly detected as supervisor 'Louis J. Rockwell.' Origin of anomaly unknown.


Project: PUPPET Optic Sensors analyzing data. Date: November 5th, 1992.

I can see.

Body Functions intact. All systems now checked and fully operational.

Mission Statement: Keeping Us Better. . .
Task Identification Code:
SEEK116A.G.tt76
76fff-Guytt76768
5038672959483
5948382888110-
A.G.f77f88f99-41

Supervisor: Louis J. Rockwell, anomaly previously detected 3 meters ahead. Behind glass.

Servant of: A.G. Industries


"A...G...In...Duh...Strees..."

My first words. Date: November 5th, 1992. My first day of activation.

All is going well. I am to serve A.G. Industries under severe protocol of Louis J. Rockwell.

My body is new. Operational.

They lead me to my chamber. Tests are to be done.

Data Stream Process: November 5th, 1992. Date of activation, according to scheduled deadline.

Activation tests must be performed, including but not limited to:
Nervous system Strain Test
Optic Capacity Test
Flight Test
Speech Test


My Surgeons and Care-takers test my reaction to pain and damage. All goes 100% according to plan. I feel no pain.

My Surgeons and Care-takers test my sight capacity. All goes according to plan until Supervisor Louis J. Rockwell enters testing chamber 4b. Prescence brings about static and foggy vision. Supervisor Louis J. Rockwell smiles at me.

I do not now how to 'smile' back at him.

My Surgeons and Care-takers test my capacity for flight. All gos according to plan. Wing structure is absolute and solid. I can fly.

Flying brings me feelings. Anomaly, error. Must report to Surgeons and Care-takers at a later point.

My Surgeons and Care-takers test my capacity for speech. Speech is slow and methodical, and easily understandable. Care-taker Susan Miranda informs Top Researchers that my speech is 'like that of a learning child. . .it will expand as it grows 'older'.' I can speak.

My first day goes according to plan. Activation has run smoothly.

Nervous system and life support at full capacity.
Optic Sesors need further examination.
Wing structure and flight capabilities are at full capacity.
Speech systems at full capacity.

Day 1 goes according to plan. My body is new. it requires rest.

I shut down for protocol: Sleep Operation A45G-6

I feel. Anomaly must be reported to Supervisors at a later point. . .

System Shut Down in progress. . .

. . .
System Shut-down complete.
Activating protocol for Recharge.


On to 'agfile8.avi'
Last modified on 2009-11-16 11:01:34Viewed 3238 times

AllRightCounter Statistics